Granby Planning Board Unanimously Approves 72-Lot Ming Estates Subdivision

GRANBY — February 9, 2026 — Granby Planning Board unanimously approves long-delayed 72-lot subdivision on Carver Street. The board passed four separate motions Monday to advance Ming Estates, a three-phase residential development proposed by Dan's Construction of Ludlow on approximately 157 acres near the Belchertown town line, reviving a 2017 approval that had expired before construction began. A central condition requires a full performance bond before any work commences on each phase, with roughly 20 lots in Phase 1, a larger Phase 2 entering from Carver Street, and a connecting Phase 3. The board stripped homeowners association language from the original 46 conditions, ruling that roads and stormwater infrastructure remain the developer's responsibility until town meeting formally accepts each street. A 20-day appeal period begins once the written decision is finalized.

Keep reading with a 14-day free trial

Subscribe to The Granby MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Granby MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Hampshire County News · The Hadley Post · The Hatfield Post · The Huntington Post · The Middlefield Post · The Northampton Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.