Granby Conservation Commission approves Redfire Farm barn project with twelve conditions
Granby Conservation Commission unanimously approved the Redfire Farm barn reconstruction project on Carver Street, subject to twelve stormwater special conditions.
GRANBY -- August 12, 2025, Granby Conservation Commission unanimously approved the Redfire Farm barn reconstruction project on Carver Street, subject to twelve stormwater special conditions. The commission, chaired by Bill Shea, required applicant engineer Jeff Squire of Berkshire Design Group to hydraulically interconnect two rain garden basins, bring total stormwater storage volume to 200 percent of the submitted design, install a maintainable level spreader, and submit a shop drawing within 30 days before construction may begin. DEP representative Mark Stinson advised that roof runoff discharge must remain outside the 146-foot Zone 1 radius of a proposed public water supply well. Separately, the commission continued the Forge Pond Dam replacement hearing, filed by the town itself, to September 9, with a site visit tentatively set for September 3. The commission also approved a $2,280 invoice to conservation agent Dave Dessolette for July services and held a prolonged discussion on unresolved stormwater maintenance obligations at the Cumberland Farms detention basins on Pleasant Street, which Stinson said may support an enforcement order under stormwater standard nine.
Members read the rest of this story and every Granby meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this story
Know someone in Granby who follows town government? Share Townbrief Granby: they can sign up free.